2018 UPC Online Fixtures and Fixture Fittings

Total CEUs = 0.2 hours or 2 hours

After completing all the lessons contained in this course you will be able to identify how, and where, 2018 UPC provisions affect the installation and maintenance of plumbing fixtures and fixture fittings. 

Upon completion of this you will be able to:

  1.      Calculate the distance from the water meter to the furthest remote outlet in the system.
  2.      Calculate the total demand fixture units in a building.
  3.      Factor in the elevation (head loss) of the highest cold water outlet.
  4.      Use the available water meter pressure to determine the correct water pipe size for a given diagram.

Click Here to Register!